Product News

Handling stealth edits

David Naffziger · · 2 min read

A redline makes a claim: what is marked is what changed. Everyone who reviews contracts relies on that claim. It is what lets a reviewer open a returned draft, read the tracked changes, and treat the rest of the document as settled.

Word does nothing to enforce it. Tracking can be off for part of an editing session and on for the rest. A change can be accepted before the file is sent, which removes the markup and keeps the edit. A paragraph can be pasted in from another draft with tracking off. Most of the time this is an accident: a template, a rushed reviewer, boilerplate copied from the last deal. Occasionally it isn’t. Either way the document changed somewhere the markup does not show.

A reviewer reading only the markup will miss it. A model reading only the markup will miss it faster, because it summarizes what the redline says and has no way to know what the redline leaves out. The change does not have to be large. A survival period that went from twelve months to thirty-six. A defined term that now points to a different section. A “shall” that became a “may.”

What revision checking does

AeroSpark keeps the full chain of documents in a negotiation: the original, the version of the contract that went out in the previous cycle, and any and all steps in between. It’s standard practice at law firms to compare a returned document with the most recent version to ensure that every change is tracked. AeroSpark does the same thing. We initially ignore the tracked changes in the document and directly compare the That produces a list of every place the text differs. We then check each difference against the redline. If a tracked change accounts for it, it is a marked revision and the reviewer will see it in the normal course of reading. If nothing accounts for it, it is an unmarked revision.

Unmarked revisions are surfaced alongside the review, identified on the triage card as a ‘stealth edit’.

The check does not judge whether a change is good or bad, and it does not replace reading the redline. It closes the gap between what is marked and what changed.

Verify what you read

Comparing two versions of a contract takes less time when you can be confident the redlines you are reviewing are in fact comprehensive. AeroSpark ensures that every document that comes back from the other side properly displays the changes that were made.

Like this:

Leave a Reply